Home News Contact
Buy Carbon Credits
  • Who We Are
  • What We Do
  • Information for Residents
  • Climate Change
  • Employment
  • Tenders

The Regional Resource Recovery Centre

Green Waste Processing Facility

The Green Waste Processing Facility creates mulch from the clean green waste gathered by council verge collections. Green Waste is also accepted from residents and commercial operators who bring it to the RRRC on trailers.

The shredder at the facility can process over 30,000 tonnes of green waste per year.

Green Waste Gate FeesPrice (Incl GST)
Green Waste 
Cars, Utilities & Trailers up to 1.5 cubic metres$25.00 per entry
Cars, Utilities & Trailers up to 1.5 - 3.0 cubic metres$50.00 per entry
Trucks and Heavy Vehicles $70.00 per tonne
Trucks and Heavy Vehicles minimum entry charge$70.00 per entry
Trucks and Heavy Vehicles oversized logs > 1.5m length, 0.3m Wide$85.00 per tonne
Commercial contracts over 1000 tonne per annum $60 - 75 per tonne
  
Palms (cut lengths 300mm)  
Cars, Utilities & Trailers up to 1.5 cubic metres$40.00 per entry
Cars, Utilities & Trailers up to 1.5 - 3.0 cubic metres$60.00 per entry
Trucks and Heavy Vehicles $90.00 per tonne
Trucks and Heavy Vehicles oversize > 1.5m length, 0.3m Wide$120 per tonne
  
Weighbridge out of use 
Uncompacted green waste (heavy vehicle)$25.00 per wheel
compacted green waste (heavy vehicle)$33.00 per wheel
Cars and Trailers over 3.0m3$60.00 per entry

By product –

This facility produces mulch and high quality soil conditioners used by farmers, industry and local councils to reduce waster consumption and evaporation.

Environmental outcome -

100% of the green waste is recovered, with no residual waste going to landfill. Each year the Green Waste Processing Facility prevents over 33,000 tonnes of carbon dioxide equivalents (TCO2-e) from entering the atmosphere.

Green Waste Processing Facility